DUNAPACK Zrt., Csepel, Construction of Energy Center
2009. June
Procurer : DUNAPACK Papír és Csomagolóanyag Zrt. - http://www.dunapack.hu
The building was performed by general brick-laying, with two floors and with transverse wall structures. The wall structures were reinforced by monolith reinforced concrete pillars. The slab was prestressed concrete and reinforced concrete grids. The foundation is countinuous footing. Under the chimneys and the boiling machines there are reinforced concrete base points.
During the implementation of the structures of the building the economic aspects, the deadline, the modifications of the structures in order to be safer in any weather conditions were to be considered. We undertook the chief structural engineer tasks of the implementation project, too.
Services :
- Static design
- Chief structural engineering