Projects
Hammerstein wind grid replacement
2007. December
Procurer : HAMMERSTEIN
Because of the transfer of the machines in the Investor’s Mór based Industrial Plant, the wind grid system providing the lenghtwise reinforcement had to be replaced. Originally these were designed in an X-frame form in a drawn extra-diagonal static model.
The aim of the redesign was to demolish the x-frames and to perform such a wind grid which provides the comfortable crossing between the rasters and keeps the rigidity of the construction.
In order to achieve the above listed, double-articulated steel reinforcing-frames were set-up, which were joined to the main supporting elements of the hangar and together serve as the proper structural solution.
Services :
- On-site-survey
- Technical conciliation
- Design of the reinforcing structures